Development Of Risk-Based Work Breakdown Structure (WBS) Standards For Integrated Design And Construction Phase On Design-Build Method Of Architectural Works Of High-Rise Building To Improve Construction Safety Performance

  • Gabby Andina Ganesdhi Department of Civil and Environmental Engineering Faculty of Engineering, Universitas Indonesia, Depok 16424, Indonesia
  • Yusuf Latief Department of Civil and Environmental Engineering Faculty of Engineering, Universitas Indonesia, Depok 16424, Indonesia
  • Danang Budi Nugroho Department of Civil and Environmental Engineering Faculty of Engineering, Universitas Indonesia, Depok 16424, Indonesia
Keywords: Architecture work, construction risk, construction safety performance, risk management and work breakdown structure.

Abstract

Design-build methods are one of the options in carrying out the construction of
high-rise buildings with a high level of uncertainty from design phase to
construction, which also affects the safety performance of the project itself.
Therefore, a prevention standard for a high-risk event is needed based on project
activities. This research was prepared using a descriptive qualitative method with
expert validation process through Delphi method and completed with a
questionnaire survey to conduct a risk assessment. The output in this research is a
development of risk-based standard work breakdown structure for architectural
work, which generated from 39 high level risk. Based on the results of the mapping
of preventive and corrective actions at high-level risks, 5 types of WBS development
can be carried out at levels 3 to 6 of the WBS to prevent and minimize the impact of
risk so that safety performance could be improved. The novelty in this research lies
in the form of design-build project delivery activities which has not been widely
discussed in previous work breakdown structure research and risk identification
based on the activities listed on the WBS.

Downloads

Download data is not yet available.

References

Putro, A and Latief, Y. (2020) Implementation of Design and Build Contract in Government Building

Construction Project Practice. IOP Conference Series: Materials Science and Engineering. vol. 897. No. 1, pp.

-016. https://doi.org/ 10.1088/1757-899X/897/1/012016

Syifa, A. (2022). Analisis Kebutuhan Sumber Daya untuk Keselamatan Konstruksi (K2) Pekerjaan Arsitektur

Bangunan Gedung Bertingkat Tinggi Rusunawa/Rusunami Berbasis Permen PUPR No. 10 Tahun 2021 untuk

Memperkirakan Biaya K2. Master Thesis. Depok: Fakultas Teknik Universitas Indonesia.

Nugroho DB and Latief Y. (2021, April). Development of Work Breakdown Structure (WBS) for Safety

Planning on Tunnelling Work Projects Based on Risk. Journal of Physics: Conference Series. 2021.1858 (1):

Available from: https://iopscience.iop.org/article/10.1088/1742-6596/1858/1/012076/meta

International Journal of Science, Technology & Management ISSN: 2722 - 4015

http://ijstm.inarah.co.id

Purnama ID. Menaker Ungkap Jumlah Kecelakaan Kerja Naik hingga 265.334 Orang di 2022 [Internet].

Availablefrom:https://economy.okezone.com/read/2023/01/12/320/2744774/menaker-ungkap-jumlahkecelakaan-kerja-naik-hingga-265-334-orang-di-2022, Accessed on March, 26. 2023.

Maulana FA and Latief Y. (2020). Development of Risk-based Standardized WBS (Work Breakdown Structure)

for Safety Planning of Coal Mine Project with Surface Mining Method. IOP Conference Series: Materials

Science and Engineering. Vol. 1007. No. 1. Article ID: 012005.

CSID.UI,“Under Design”Picu Kecelakaan Kerja Proyek Infrastruktur-CSID UI,.Accessed on March,26. 2023.

Elsye V, Latief Y and Sagita L. (2018). Development of Work Breakdown Structure (WBS) Standard for

Producing the Risk Based Structural Work Safety Plan Of Building. MATEC Web of Conferences. Vol. 147. pp.

https://doi.org/10.1051/matecconf/201814706003.

Ponticelli S, O'Brien W, and Leite F. (2015). Advanced Work Packaging as Emerging Planning Approach to

Improve Project Performance: Case Studies from the Industrial Construction Sector. 5th International/11th

Construction Specialty Conference. Vol. 230. pp. 1-10.

Project Management Institute. (2017). Project Management Body of Knowledge - Sixth Edition. Pennsylvania:

Project Management Institute, Inc.

Mintohardjo A. (2022). Pengembangan Standar Work Breakdown Structure Berbasis Risiko pada Bangunan

Utama Gedung Stadion dengan Kontrak Terintegrasi Rancang Bangun untuk Perencanaan Biaya dan Waktu.

Master Thesis. Depok: Fakultas Teknik Universitas Indonesia.

Wijaya, L., Latief, Y., and Machfudiyanto, R. A. (2020) Development of Preventive Maintenance Guidelines for

Architectural Components on Government Building Based on Work Breakdown Structure. Civil Engineering

and Architecture, Vol. 8, No. 3, pp. 312-319. https://doi.org/ 10.13189/cea.2020.080315

Anggraini, A., & Latief, Y. (2021, April). Development of work breakdown structure standard for safety

planning on stadium construction work based on risk. In Journal of Physics: Conference Series (Vol. 1858, No.

, p. 012073). IOP Publishing. https://doi:10.1088/1742-6596/1858/1/012073

Jati, D. B., & Latief, Y. (2020, September). Development of risk-based standardized Work Breakdown Structure

(WBS) to improve time performance on high-speed railway construction project. In IOP Conference Series:

Materials Science and Engineering (Vol. 930, No. 1, p. 012065). IOP Publishing. DOI 10.1088/1757-

X/930/1/012065

Haslam, R. A., Hide, S. A., Gibb, A. G., Gyi, D. E., Pavitt, T., Atkinson, S., & Duff, A. R. (2005). Contributing

factors in construction accidents. Applied ergonomics, 36(4), 401-415.

https://doi.org/10.1016/j.apergo.2004.12.002

Gambatese, J. A., Behm, M., & Rajendran, S. (2008). Design’s role in construction accident causality and

prevention: Perspectives from an expert panel. Safety science, 46(4), 675-691.

https://doi.org/10.1016/j.ssci.2007.06.010

Nugroho, D. B., & Latief, Y. A Conceptual Framework for Knowledge Management of Integrated Design and

Construction Phase Audit Process on Infrastructure Project Based on Risk, Using WBS, BIM and Web to

Enhance Construction Safety Performance.

Yufrizal, A. H., et al., (2021). Development Standard Operational Procedure of Safety Architecture Work in

University of Indonesia Project Based on Work Breakdown Structure to Reduce Work Accidents. Journal of

International Conference Proceedings (JICP) Vol. 4 No. 2, 254-263, November, 2021 P-ISSN: 2622-0989/EISSN: 2621-993

Published
2023-07-23
How to Cite
Andina Ganesdhi, G., Latief, Y., & Budi Nugroho, D. (2023). Development Of Risk-Based Work Breakdown Structure (WBS) Standards For Integrated Design And Construction Phase On Design-Build Method Of Architectural Works Of High-Rise Building To Improve Construction Safety Performance. International Journal of Science, Technology & Management, 4(4), 792-801. https://doi.org/10.46729/ijstm.v4i4.896
Section
Articles