Development Of Risk-Based Work Breakdown Structure (WBS) Standards For Integrated Design And Construction Phase On Design-Build Method Of Architectural Works Of High-Rise Building To Improve Construction Safety Performance
Abstract
Design-build methods are one of the options in carrying out the construction of
high-rise buildings with a high level of uncertainty from design phase to
construction, which also affects the safety performance of the project itself.
Therefore, a prevention standard for a high-risk event is needed based on project
activities. This research was prepared using a descriptive qualitative method with
expert validation process through Delphi method and completed with a
questionnaire survey to conduct a risk assessment. The output in this research is a
development of risk-based standard work breakdown structure for architectural
work, which generated from 39 high level risk. Based on the results of the mapping
of preventive and corrective actions at high-level risks, 5 types of WBS development
can be carried out at levels 3 to 6 of the WBS to prevent and minimize the impact of
risk so that safety performance could be improved. The novelty in this research lies
in the form of design-build project delivery activities which has not been widely
discussed in previous work breakdown structure research and risk identification
based on the activities listed on the WBS.
Downloads
References
Putro, A and Latief, Y. (2020) Implementation of Design and Build Contract in Government Building
Construction Project Practice. IOP Conference Series: Materials Science and Engineering. vol. 897. No. 1, pp.
-016. https://doi.org/ 10.1088/1757-899X/897/1/012016
Syifa, A. (2022). Analisis Kebutuhan Sumber Daya untuk Keselamatan Konstruksi (K2) Pekerjaan Arsitektur
Bangunan Gedung Bertingkat Tinggi Rusunawa/Rusunami Berbasis Permen PUPR No. 10 Tahun 2021 untuk
Memperkirakan Biaya K2. Master Thesis. Depok: Fakultas Teknik Universitas Indonesia.
Nugroho DB and Latief Y. (2021, April). Development of Work Breakdown Structure (WBS) for Safety
Planning on Tunnelling Work Projects Based on Risk. Journal of Physics: Conference Series. 2021.1858 (1):
Available from: https://iopscience.iop.org/article/10.1088/1742-6596/1858/1/012076/meta
International Journal of Science, Technology & Management ISSN: 2722 - 4015
Purnama ID. Menaker Ungkap Jumlah Kecelakaan Kerja Naik hingga 265.334 Orang di 2022 [Internet].
Availablefrom:https://economy.okezone.com/read/2023/01/12/320/2744774/menaker-ungkap-jumlahkecelakaan-kerja-naik-hingga-265-334-orang-di-2022, Accessed on March, 26. 2023.
Maulana FA and Latief Y. (2020). Development of Risk-based Standardized WBS (Work Breakdown Structure)
for Safety Planning of Coal Mine Project with Surface Mining Method. IOP Conference Series: Materials
Science and Engineering. Vol. 1007. No. 1. Article ID: 012005.
CSID.UI,“Under Design”Picu Kecelakaan Kerja Proyek Infrastruktur-CSID UI,.Accessed on March,26. 2023.
Elsye V, Latief Y and Sagita L. (2018). Development of Work Breakdown Structure (WBS) Standard for
Producing the Risk Based Structural Work Safety Plan Of Building. MATEC Web of Conferences. Vol. 147. pp.
https://doi.org/10.1051/matecconf/201814706003.
Ponticelli S, O'Brien W, and Leite F. (2015). Advanced Work Packaging as Emerging Planning Approach to
Improve Project Performance: Case Studies from the Industrial Construction Sector. 5th International/11th
Construction Specialty Conference. Vol. 230. pp. 1-10.
Project Management Institute. (2017). Project Management Body of Knowledge - Sixth Edition. Pennsylvania:
Project Management Institute, Inc.
Mintohardjo A. (2022). Pengembangan Standar Work Breakdown Structure Berbasis Risiko pada Bangunan
Utama Gedung Stadion dengan Kontrak Terintegrasi Rancang Bangun untuk Perencanaan Biaya dan Waktu.
Master Thesis. Depok: Fakultas Teknik Universitas Indonesia.
Wijaya, L., Latief, Y., and Machfudiyanto, R. A. (2020) Development of Preventive Maintenance Guidelines for
Architectural Components on Government Building Based on Work Breakdown Structure. Civil Engineering
and Architecture, Vol. 8, No. 3, pp. 312-319. https://doi.org/ 10.13189/cea.2020.080315
Anggraini, A., & Latief, Y. (2021, April). Development of work breakdown structure standard for safety
planning on stadium construction work based on risk. In Journal of Physics: Conference Series (Vol. 1858, No.
, p. 012073). IOP Publishing. https://doi:10.1088/1742-6596/1858/1/012073
Jati, D. B., & Latief, Y. (2020, September). Development of risk-based standardized Work Breakdown Structure
(WBS) to improve time performance on high-speed railway construction project. In IOP Conference Series:
Materials Science and Engineering (Vol. 930, No. 1, p. 012065). IOP Publishing. DOI 10.1088/1757-
X/930/1/012065
Haslam, R. A., Hide, S. A., Gibb, A. G., Gyi, D. E., Pavitt, T., Atkinson, S., & Duff, A. R. (2005). Contributing
factors in construction accidents. Applied ergonomics, 36(4), 401-415.
https://doi.org/10.1016/j.apergo.2004.12.002
Gambatese, J. A., Behm, M., & Rajendran, S. (2008). Design’s role in construction accident causality and
prevention: Perspectives from an expert panel. Safety science, 46(4), 675-691.
https://doi.org/10.1016/j.ssci.2007.06.010
Nugroho, D. B., & Latief, Y. A Conceptual Framework for Knowledge Management of Integrated Design and
Construction Phase Audit Process on Infrastructure Project Based on Risk, Using WBS, BIM and Web to
Enhance Construction Safety Performance.
Yufrizal, A. H., et al., (2021). Development Standard Operational Procedure of Safety Architecture Work in
University of Indonesia Project Based on Work Breakdown Structure to Reduce Work Accidents. Journal of
International Conference Proceedings (JICP) Vol. 4 No. 2, 254-263, November, 2021 P-ISSN: 2622-0989/EISSN: 2621-993