Alternative Road Economic Feasibility Study Medan-Berastagi Via Tuntungan Intersection-Sibolangit

  • Amrizal Amrizal Department of Civil Engineering, Politeknik Negeri Medan, Medan, Indonesia
  • Kusumadi Kusumadi Department of Civil Engineering, Politeknik Negeri Medan, Medan, Indonesia
  • Fadli Fadli Department of Civil Engineering, Politeknik Negeri Medan, Medan, Indonesia
  • Samiran Samiran Department of Civil Engineering, Politeknik Negeri Medan, Medan, Indonesia
Keywords: Alternative, route, construction, costs and feasibility.

Abstract

As a sustainable from the research in 2019 regarding the Planning of the
Medan-Berastagi Alternative Route that the Researchers have carried out, this
year it is planned to conduct research related to the cost of construction and the
feasibility of constructing the alternative route as a whole economy. It is
important that a study be carried out immediately because of the importance of
this alternative route considering the frequent occurrence of severe traffic jams
due to accidents or natural disasters along this route in recent times. Knowing
the development costs as well as the economic feasibility of this new route will
help interested stakeholders in making decisions regarding this new route. The
total construction cost which includes construction costs, design and supervision
costs and land acquisition costs is IDR 1,171,518,647,736 while the annual
routine maintenance costs are IDR 3,114,325,566 and periodic maintenance
costs per five years are IDR 87,808,542,710. Calculation of Vehicle Operating
Costs (VOC) is carried out by referring to Pacific Consultant International
(PCI) standards while the Time Value calculation is adopted from the 2001 Bina
Marga “Heavy Loaded Road Improvement Project – Master Plan Review” study
(for Buses and Passenger Cars) and “Sumatera Region Road Project” PU
(2000) for trucks. The existence of the Medan-Berastagi alternative road will
save VOC of IDR 22,120,269,410 and Time Value savings of IDR
57,337,666,839 in 2023. The economic feasibility analysis results can be seen
that the value of the Economic Internal Rate of Return is 12,06% greater than
the current lending rates are in the range of 8-9%. At the prevailing interest rate
of 10%, the Benefit Cost Ratio is 1.16 and the Net Present Values are IDR
204,496,000,000. These results indicate that the construction of the MedanBerastagi Alternative Road is economically feasible.

Downloads

Download data is not yet available.

References

Amrizal; Ade Irma Khairani; Falwan Gunawan, “THE ALTERNATIVE PLANNING ROUTES FOR PANCUR BATU-BANDAR BARU,” Int. J. Manag. Stud. Soc. Sci. Res., vol. 4, no. 2 March-April, pp. 14–24, 2022, [Online]. Available: https://www.ijmsssr.org/paper/IJMSSSR00643.pdf.

K. Perhubungan, PM 9 Tahun 2014 tentang TATA CARA PENETAPAN JARINGAN PELAYANAN DAN LINT AS PELAYANAN PERKERETAAPIAN. 1ndonesia, 2014.

A. Ayub, “Aspek Keuangan Studi Kelayakan Bisnis.” pp. 1–11, 2022, [Online]. Available: https://andiayubln.blogspot.com/2022/03/aspek-keuangan-studi-kelayakan-bisnis.html.

Muhammad Fikry Ali et al, “Analisis Kelayakan Pendirian Cabang Baru Kedai Kopi Kendara di Kota Bandung Ditinjau dari Aspek Pasar, Teknis, dan Finansial,” e-Proceeding Eng., vol. 7, no. 2, pp. 5127–5134, 2021, [Online]. Available: https://openlibrarypublications.telkomuniversity.ac.id/index.php/engineering/article/viewFile/12038/11863.

Sites.google.com, “Manajemen Keuangan Perusahaan,” Sites.google.com, 2022. https://sites.google.com/site/manajemenkeuanganperusahaan/ (accessed Jun. 08, 2022).

N. Rosiana, “KELAYAKAN PENGEMBANGAN USAHA AKARWANGI (Andropogon Zizanoid) PADA KONDISI RISIKO DI KABUPATEN GARUT,” INSTITUT PERTANIAN BOGOR, 2008.

Y. Basri, “BAB IV KEBIJAKSANAAN INVESTASI,” Yuliatri Basri’s Corner, 2021. https://materiyuliatibasri.blogspot.com/2017/10/bab-iv-kebijaksanaan-investasi.html.

W. K. Eko Subandriyo., Ridho Roni Marpaung, Ismiyati, “Jurnal Karya Teknik Sipil,” Anal. Perbandingan Biaya Oper. Kendaraan Jalan Lingk. Ambarawa Dan Jalan Eksisting, vol. 3, no. 4, pp. 356–366, 2014.

D. A. Hensher, “Measurement of the Valuation of Travel Time Savings,” J. Transp. Econ. Policy, vol. 35, no. 1, pp. 71–98, 2001, Accessed: Nov. 16, 2022. [Online]. Available: http://www.jstor.org/stable/20053859.

Jica, “Heavy Loaded Road Improvement Project,” 2002.

K. Pekerjaan Umum, “Standard Biaya Khusus Jalan Perkerasan Lentur Tahun 2011.” Kementerian Pekerjaan Umum, Jakarta, 2011.

A. Rachman, “Pencarian Terpopuler Suku Bunga Dasar Kredit Mulai Naik , tapi Belum Imbangi Bunga Acuan BI,” bisnis.tempo.co, Jakarta, p. 2, 2022.

Published
2023-01-09
How to Cite
Amrizal, A., Kusumadi, K., Fadli, F., & Samiran, S. (2023). Alternative Road Economic Feasibility Study Medan-Berastagi Via Tuntungan Intersection-Sibolangit. International Journal of Science, Technology & Management, 4(1), 14-22. https://doi.org/10.46729/ijstm.v4i1.710

Most read articles by the same author(s)