Risk Identification And Analysis In Engineering, Procurement, And Construction (EPC) Projects At Mining Facilities By PT. XYZ

  • Mushab Syakieb Alkatiri Graduate Program in Project Management, Universitas Indonesia, Depok, Indonesia
  • Leni Sagita Riantini Graduate Program in Project Management, Universitas Indonesia, Depok, Indonesia
  • Bastian Okto Bangkit Sentosa Graduate Program in Project Management, Universitas Indonesia, Depok, Indonesia
Keywords: Risk Analysis; Risk Identification; EPC; Mining and PMBOK.

Abstract

Risk management in Engineering, Procurement, and Construction (EPC) projects within the mining sector is critical to ensure project success and avoid potential disruptions. PT. XYZ, a company engaged in mining infrastructure development, faces a variety of risks ranging from technical and logistical challenges to external and environmental uncertainties. This study aims to identify and analyze the risks present in EPC projects carried out by PT. XYZ. The research begins with risk identification through expert interviews and document analysis, followed by a qualitative risk analysis based on the Project Management Body of Knowledge (PMBOK) framework to assess the probability and impact of each risk. The findings reveal several high-priority risk factors that require focused attention in future project planning. This study is expected to provide valuable insights into risk conditions in EPC projects and contribute to better risk-informed decision-making processes for PT. XYZ.

Downloads

Download data is not yet available.

References

A. Al-Nuaimi, R. Taha, M. Al Mohsin, A. Al-Harthi, Causes, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman, Journal of Construction Engineering and Management, 2010.

M. Alzara, Exploring the Impacts of Change Orders on Performance of Construction Projects in Saudi Arabia, Advances in Civil Engineering, 2022, 10.1155/2022/5775926.

J.M. Antill, R.W. Woodhead, Critical Path Methods in Construction Practice, John Wiley & Sons, 1990.

S.A. Assaf, S. Al-Hejji, Causes of delay in large construction projects, International Journal of Project Management, 24(4), 2006, pp. 349-357.

H.F. Cervone, Managing conflict in the digital library environment, OCLC Systems & Services: International Digital Library Perspectives, 30(3), 2014, pp. 137-142.

F. Firdausy, Risk analysis and recommendations to improve the logistics cost performance of the EPC project at remote area, Journal Research of Social Science, Economics, and Management, 2(10), 2023, pp. 2428-2448.

S. Freitas, J.C. Pereira, Risk Analysis in the Manufacturing and Transportation of Precast Concrete using PFMEA, 2023, 10.3850/978-981-18-8071-1_P386-cd.

P.D. Galloway, Construction Project Management: A Practical Guide for Building and Electrical Contractors (2nd ed.), CRC Press, 2006.

P.D. Galloway, Survey of the construction industry relative to the use of CPM scheduling for construction projects, Journal of Construction Engineering and Management, 132(7), 2006, pp. 697-711.

J. Gido, J. Clements, Successful Project Management (8th ed.), Cengage Learning, 2021.

Y.Y. Haimes, Risk Modeling, Assessment, and Management (4th ed.), Wiley, 2015.

D. Hillson, Managing Risk in Projects, Routledge, 2009.

H. Kerzner, Project Management: A Systems Approach to Planning, Scheduling, and Controlling, John Wiley & Sons, 2017.

M. Khezri, M. Farahani, S. Motahhari, B. Azadbakht, Environmental Risk Assessment of Hydrocarbon-Rich Sludge of a Gas Refinery Using the Integrated Approach of PMBOK Standard Risk Management and FMEA Technique: A Case Study, Journal of Advances in Environmental Health Research, 11, 2023, pp. 253-263. 10.34172/jaehr.1316.

D. Lock, Project Management: A Systemic Approach to Planning, Scheduling, and Controlling (10th ed.), Wiley, 2020.

F. Mas'ud, B. Mursidi, L. Darmawan, F.R. Rustan, Analisis manajemen risiko waktu dan biaya pada proyek konstruksi pembangunan RSUD tipe D kota Kendari, Jurnal Ilmiah Teknik Sipil, 11, 2023, pp. 122. 10.55679/jts.v11i3.43080.

D. Novianto, A. Nugroho, B.P. Samadikun, Identifikasi dan Analisis Manajemen Risiko pada Pekerjaan High Rise Building Studi Kasus: Proyek Pembangunan Gedung Penunjang Siaran dan Studio Luar Negeri, Jurnal Profesi Insinyur Indonesia, 1(7), 2024, pp. 292-299. https://doi.org/10.14710/jpii.2023.23855.

H. Pertiwi, Implementasi Manajemen Risiko Berdasarkan PMBOK Untuk Mencegah Keterlambatan Proyek Area Jawa Timur (Studi Kasus: PT. Telkom), Jurnal Studi Manajemen dan Bisnis, 4, 2017, pp. 96-108. 10.21107/jsmb.v4i2.3959.

Project Management Institute (PMI), A Guide to the Project Management Body of Knowledge (PMBOK® Guide) (6th ed.), Project Management Institute, 2017.

F. Santos, S. Cabral, FMEA and PMBOK applied to project risk management, Journal of Information Systems and Technology Management, 5, 2008. 10.4301/S1807-17752008000200008.

N.J. Smith, T. Merna, P. Jobling, Managing Risk in Construction Projects (3rd ed.), Wiley-Blackwell, 2014.

H. Syahputra, W. Abdillah, S. Widodo, S. Anwar, Manajemen risiko proyek berdasarkan panduan body of knowledge manajemen proyek 2017, Jurnal Manajemen dan Bisnis,2,2022, pp.01-13. 10.32509/jmb.v2i1.1987.

R. Turner, The Handbook of Project-Based Management, McGraw-Hill Education, 2009.

B. Yakub, T. Borisade, O. Ajayi, Relevance of Risk Management in the Delivery of Construction Projects in Developing Countries, LAUTECH Journal of Civil and Environmental Studies, 8, 2022, pp. 70-82.

Badan Pusat Statistik, Statistical Yearbook of Indonesia 2022, BPS-Statistics Indonesia, Jakarta,2022,p.xliv 780.

Indonesia Construction Market to Reach USD 451.47 Billion by 2030, Next Move Strategy Consulting, 2024. [Online]. Available: https://www.nextmsc.com/news/indonesia-construction-market.

Published
2025-07-27
How to Cite
Syakieb Alkatiri, M., Sagita Riantini, L., & Okto Bangkit Sentosa, B. (2025). Risk Identification And Analysis In Engineering, Procurement, And Construction (EPC) Projects At Mining Facilities By PT. XYZ. International Journal of Science, Technology & Management, 6(4), 675-678. https://doi.org/10.46729/ijstm.v6i4.1323
Section
Articles