Identification Of Communication Flows And Information Distribution In The Manufacturing Project Control Division Of PT XYZ
Abstract
PT XYZ has four divisions: sales, implementation, planning and evaluation, and finance. As time goes by, there is a recurring phenomenon/case, namely delays in the information distribution process in each division due to ineffective communication flow procedures. Each division has an ongoing distribution of information that is not integrated and can only be accessed by the respective division's personnel. This greatly affects the company directly and indirectly. In this research, the flow of communication at PT XYZ and stakeholders will be identified, as well as the roles and responsibilities of each division personnel at PT XYZ to improve effective and efficient work. The research results also emphasize the communication flow of each division so that each party fully understands the distribution of information to carry out ongoing project implementation at PT XYZ.
Downloads
References
A. L. Wulandari, “Pengaruh Faktor-Faktor Efektivitas Komunikasi Terhadap Kinerja Waktu Proyek,” 2013.
Fikri Ramadhan Lubis, “Pengembangan Proses Manajemen Proyek Engineering Berbasis Pmbok Untuk Meningkatkan Kinerja Waktu,” 2018.
G. B. R. D. S. R. A. Hoga Saragih, “Pengembangan Sistem Informasi Distribusi Informasi Sekolah Melalui Sms Gateway Dengan Zachman Framework,” 2020.
A. C. Campos, J. A. Silva, P. Pinto, J. Da, C. Mendes, and P. Oom Do Valle, “Critical success factors for a total quality culture: A structural model Critical success factors for a total quality culture: A structural model Fatores críticos de sucesso de uma cultura da qualidade total: um modelo estrutural.
R. Mareno, C. Z. Oktaviani, and S. Husin, “Analisis Korelasi Faktor Komunikasi Proyek Terhadap Pencapaian Kinerja Waktu Di Kota Banda Aceh,” Jurnal Arsip Rekayasa Sipil dan Perencanaan, vol. 5, no. 1, pp. 38–46, Mar. 2022, doi: 10.24815/jarsp.v5i1.25284.
M. Muneer et al., “A Quantitative Study of the Impact of Organizational Culture, Communication Management, and Clarity in Project Scope on Constructions’ Project Success with Moderating Role of Project Manager’s Competencies to Enhance Constructions Management Practices,” Buildings, vol. 12, no. 11, Nov. 2022.
E. Kania, G. Sladowski, E. Radziszewska-Zielina, and B. Sroka, “Analysis of the impact of communication between the participants of a construction project on its completion time and cost,” Archives of Civil Engineering, vol. 68, no. 1, pp. 595–610, 2022, doi: 10.24425/ace.2022.140188.
S. H. Al-Jibouri, “Monitoring systems and their effectiveness for project cost control in construction,” 2003.
M. Lestari and D. Setiyadi, “Sistem Informasi Monitoring Perkembangan Proyek Dalam Bidang Kontruksi Berbasis Web Pada CV Jaya Makmur Bekasi,” vol. 3, no. 2, pp. 109–122, 2019.
E. Kania, G. Śladowski, E. Radziszewska-Zielina, B. Sroka, and B. Szewczyk, “Planning and monitoring communication between construction project participants,” Archives of Civil Engineering, vol. 67, no. 2, pp. 455–473, 2021, doi: 10.24425/ace.2021.137179.
Divisi Pengendalian, “Prosedur Pengendalian Penjualan,” 2022.
H. DERMAWAN, “Evaluasi Manajemen Komunikasi Proyek Gedung Sekolah Di Yayasan X Untuk Mengurangi Keterlambatan Penyelesaian Proyek - Hans Dermawan,” 2016.
F. Ardiansyah, “Pengembangan Sistem Manajemen Komunikasi Berbasis It Pada Tahap Pelaporan Kinerja Dalam Pengendalian Proyek Konstruksi Dengan Pendekatan Internet Web-Based Database Management,” 2013.
Copyright (c) 2024 International Journal of Science, Technology & Management

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.